nfitz
Superstar
I don't think I'm seeing more than would fit on a single bus. Perhaps a misleading photo.
I missed something - what event?
I missed something - what event?
Reading week.I don't think I'm seeing more than would fit on a single bus. Perhaps a misleading photo.
I missed something - what event?
Historically, students were more likely to make the trek back home for Thanksgiving, as that is the first holiday after the start of classes.I rode that train in both directions today, it was still very busy but seemed significantly less busy than the ones they ran last October, I wonder why that is
Historically, students were more likely to make the trek back home for Thanksgiving, as that is the first holiday after the start of classes.
As well, in certain programs, reading week is also a time for exams. Thus, the students in those classes must stay.
Dan
Because the train was created for political consideration and London has private regional bus operators?When GO is looking at expanding their bus routes, is there a methodology to it? For example, there was no GO bus to London, but the put the train to it, and the cut it, and still no bus to it.
AFAIK there is no regional bus service. I would have hoped that after shutting down the extension that they created commuter service between London and Kitchener/Hamilton. There is a possibility of 2-3 different routes that could have been used to build the case to return the GO train in the future. I am also thinking of places north of Barrie or east of Oshawa towards Port Hope and beyond.I know east, they do have towards Peterborough, which if the VIA/HxR ever happens,this could help there.Because the train was created for political consideration and London has private regional bus operators?
I was in that crowd. I counted around 75 or so people - not all students.I don't think I'm seeing more than would fit on a single bus. Perhaps a misleading photo.
I missed something - what event?
as you know, on February 8, Minister Sarkaria wrote to the feds asking for their contribution in delivering "frequent two way all day service on the Milton corridor through construction of a fully separated passenger railway. This will allow for parallel operation for both freight and passenger rail service, which would enable CPKC to preserve their freight capacity and Metrolinx to enhance passenger rail service for this growing community".
The Minister also cited that he had received an IBC which estimated capital costs to be "upward of $6.2B".
I spent some time trying to reconcile this cost with the costs in the 2015 IBC for GO RER, kindly provided by Chris. Here are my observations:
Therefore total 2015 capital cost per IBC, adjusted for 9 extra crossings, is about $2.6B, including fleet.
- The Sarkaria case seems very close to Scenario 4 (Full Build) in the 2015 IBC:
- 4 trains/hr Milton-Union all day contrapeak, off peak
- 4 trains/hr Milton - Union weekends
- 4 trains/hr Milton- Union in the 3 hour peak period. (Larger trains used than off-peak)
- The infrastructure listed for Scenario 4 was:
- two additional tracks full length West Toronto to Milton
- Reinstall track West Toronto - Union
- Fly under East Humber river
- 3 road-rail grade separations (Stanfield, Wolfsdale, Erindale Stn Rds)
- Station modifications at all 9 stations
- Electrification to allow use of EMUs and Electric locos
- The capital cost, excluding fleet and system-wide costs, but including 50% contingency and 25% "acceleration" was $1.84B
- Table C-7 gives a different total, including fleet, at $2.2B
- I read some speculation that CPKC was asking for road-rail separation at every level crossing. There are about 9 additional crossings not slated for separation in the IBC (Haines, Queen St, Thomas, Tannery. Ontario , 10 th Line,9th line. 6th line, 5th line). Assuming unit costs similar to the 3 in the IBC, this would add about $400M to the capital cost
This is a long way from upwards of $6.2B. Could prices have escalated that much? Is there additional scope not cited in the 2015 IBC?
Your thoughts would be welcomed.
This is a long way from upwards of $6.2B. Could prices have escalated that much? Is there additional scope not cited in the 2015 IBC?
Very chic looking station building. Looks like a nuclear bunker.![]()




