Gronk!
Senior Member
This is what I have been imagining. My apologies for how amateur it may be, I just slapped it together quickly. Starting at Brewery District along the VLW alignment, Terminating the Spur at the VIA station.
View attachment 580730View attachment 580731View attachment 580732View attachment 580733
What we're looking at is a branch line that feeds to and from downtown. It could terminate at MWTC, or anywhere else in between. More complex switching is possible to allow for connection to this spur from the west, but I don't see the point since you could simply transfer at Brewery/120 ST or the Yards/116 ST.
I would recommend identical wire fencing to the Metro line in Blatchford along the majority of the alignment due to the proximity to the park and MUPs. Pedestrian crossings would share the design of the Metro expansion in Blatchford.
My preference for stops would be far more bare bones than the current Valley Line. For cost reasons, I'd recommend what is essentially a raised sidewalk with benches and wind shelters with timed wave on heaters.
Concrete sleepers on a standard ballast would be preferred for the majority of this alignment. Concrete embedded tracks would be ideal for all street crossings, and the 121 St section next to Brewery.
This extension would very realistically cost $150-250m. It would serve a large amount of apartments that line 124th street, it would solve the much needed connection to the VIA station, and it would allow for future expansion across the Yellowhead along a similar line to the old tram.
I really like the idea @Habibfazil had about an Intercity bus station. Obviously ETS could terminate some routes here, but inviting Flixbus to stage their pickups and dropoffs at this location would also be a positive.
I think the city could receive significant money from the feds and the provincial government for this. Especially if they sold this as a commitment to regional rail, which is Smith's brightest spot IMO.
Thanks.
Edit: I clicked on the link that @EdwardEdm posted after making this. It appears that I just recreated a new version of the Northwest Line from the old planning documents.
View attachment 580742
Good job!
May I suggest LRT stops with the following names:
- Brewery District Station (about to be constructed on VLW)
- Manchester Square Station (on 107 Ave)
- Queen Mary`s Market Station (on 111 Ave)
- Inglewood Station (on 118 Ave and Kingsway)
- Terminal Station (VIA Rail)
I`m not sure how much of the VIA Rail track can be converted to LRT. You may want a separate line north of 118 Ave.
Also, you may likely need to keep most of the existing MUPs as intact as possible or risk the wrath of cyclists!




