News   GLOBAL  |  Apr 02, 2020
 9.6K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.4K     0 

I believe there is a lot of utility work to be done still as well for the development parcels. Many of the lots don't have servicing.
 
March 24
Only a small crew on site working on landscaping. A 2nd entrance will be going into the plaza on the east side of the current one, with landscaping for the old and new area east of it to the Beamish street. The new land area between Beamish and Kipling will house at least 3 towers.

Some work was taking place on the south side but not sure what as the crew was standing around.

The road curb on the north side will have to be move out from the plaza to Auckland to match the new Dundas Rd.
More up on site
49698474972_775019ab34_b.jpg

49698474397_fb05b85228_b.jpg

49698167406_6078b44b93_b.jpg

49698472287_8f9740f74a_b.jpg

49697632978_0acf29ca98_b.jpg

49697632513_46e5b206ae_b.jpg

49698470902_063390b1cf_b.jpg

49698469947_1aef74a231_b.jpg

49697630253_873ba62bb1_b.jpg

49698468947_d67e512723_b.jpg

49698163016_324ae6dac1_b.jpg

49697628943_61c7a5a3af_b.jpg

49698467382_a511a61aa9_b.jpg
 
April 29
The Old Dundas is now open to Kipling and hope they place a medium there as a fair number of driver are making an illegal left turn onto Kipling.

The short road between the old Dundas and the New Bloor has been built, but not pave. Lot more sidewalk being built, but not connected at the intersections

Medium being built for centre traffic lights as well at Beamish to stop left turns onto Dundas

Working on rebuilding Bloor St west of Kipling with retaining wall for the plaza as well the Dundas and Dunbloor intersection.

Lot more photos up on site.
49855672678_3ff9151feb_b.jpg

49856513702_75b029fbb9_b.jpg

49855673673_db3ffa8624_b.jpg

49856515232_a9e779827b_b.jpg

49855675128_71bb649970_b.jpg

49856215071_5e44bc4139_b.jpg

49855677723_15a4793d17_b.jpg

49856217946_d3cfa4b760_b.jpg

49856520242_6229550ba0_b.jpg

49856520612_c6ed137962_b.jpg

49855680613_b86f9c1d23_b.jpg

49856523457_827655b9d3_b.jpg

49855684563_eac941bd18_b.jpg

49855686223_6d7b707fdf_b.jpg

49856227331_79b1e3c8be_b.jpg

49856510472_1f926790f2_b.jpg
 
I can't believe they actually sprung for ornamental streetlights. It's not the most inspired design, but it looks like they were actually designed as opposed to being purely utilitarian fixtures like the ones on Bloor Street in Yorkville.
 
The laying of sod (grass, man) will probably happen later in the year. There will probably be a backlog for sod for landscaping projects.
 
^^^ Great pictures!!!

Does the recent Covid 19 economic fallout for the City of Toronto affect the development of these lands going forward?
 
Does the recent Covid 19 economic fallout for the City of Toronto affect the development of these lands going forward?

Short answer is Yes but probably not in an obvious way. Developers will take a couple years to figure out what is still selling and any design adjustments necessary.

There are scenarios where everybody leaves the city. If you can live in Whistler BC with a downtown Toronto banker salary; why wouldn't you? I can also see the land being more valuable. If people work from home ~3 days per week, larger units (2 bed + 2 office) may be in demand.

We might even see a move to a shared office space as a condo amenity like the shared exercise and party rooms; buildings without work-from-home accommodations may have less value (like those with 8 foot ceilings).
 
Last edited:
^Keep in mind that a) Tory has promised that Six Points will have a substantial component of “affordable housing” and b) the area is designated as a City Centre, implying some element of mixed use as opposed to “condos, condos, condos” and c) so far, the land is still city-owned.
Between changes in what will sell post- Covid, and the need to reconcile some diverging development goals, I suspect that developing this area will take forever and be hugely controversial.
Or maybe the usual Etobicoke politics will prevail, the developers will set the tune, and the politicians will roll over on city building.

- Paul
 
  • Like
Reactions: rbt
I feel like work has slowed down noticeably on this project...

The pylons are placed different every time I go through the zone, and I have actually seen workers and equipment at work within the last few days.

- Paul
 
Dundas is down to a single lane in each direction east of Aukland, that indicates work is about to start on rebuilding the centre road with a medium first, then do the curb lane.

Fail to shot it while shooting the other sites, will take a look later on this week as to what new.

They were installing the planter edges on the south side and there are trees there to be planted in the planters.
 

Back
Top