News   GLOBAL  |  Apr 02, 2020
 9.6K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.4K     0 

August 10 construction update posted:
 
Aug 8
More up on site for this date
50212338418_1b66b18c22_b.jpg

50212867351_7e5121e7b0_b.jpg

50213136627_d0c07dd852_b.jpg

50213137052_9b47cdf1d9_b.jpg

50213137132_0183e63bbe_b.jpg

50212868456_b79027621f_b.jpg

50212340053_88df04d528_b.jpg

50212869396_b7047ed011_b.jpg

50212340618_ddcb7eaa15_b.jpg

50212340733_398ab86b0a_b.jpg

50213138752_671c570967_b.jpg

50212870436_1075677861_b.jpg

50212870526_2e844b6132_b.jpg

50213139717_fcb29d4679_b.jpg

50213139837_408c1db841_b.jpg

50212871061_c23ee3cc00_b.jpg

50212342518_426fe05a55_b.jpg

50212342608_d294bc3887_b.jpg

50212871976_11b81352b1_b.jpg

50212344203_eea9cfb742_b.jpg
 
Bloor centre lane is now pave with traffic using it now only.

Beamish has seen final coat of pavement on it.

Dundas west of Beamish to Kipling and more so to Bloor has final top coat pavement, but never look at that area. The west section to Aukland is a single lane in east direction with the main contractor doing curve and sidewalks. Crews working on the south side with parts of sidewalk built and got most of the driveway close by the Westward Apartment with the forming of the curb. The new curb is a foot or 2 to the north now and that shows up quite clearly for the east end driveway.

All the area between the curb and the land on the north side has been excavated and waiting forming of the sidewalk. A number of poles can be remove now and a few more when the forming of the sidewalk takes place. The centre lanes close with construction vehicles there. Single lane traffic for some time for both Bloor and Dundas.
 
Next comes the narrowing of Dundas Street West, west of Kipling, to include bus lanes, cycle lanes, and wider pedestrian sidewalks?

Make the right most lane for buses and right turns; the next lane 30 km/h only for bicycles, e-bikes, and any other vehicle doing under 32 km/h; and the left lanes for motor vehicles.

 
Aug 14
Not sure you will see wider sidewalks west of Aukland. To be clear, you have planters that makes the sidewalk look wider.
This is at Acorn Ave and go east just before Aukland. Bike lane on the road.
50208481356_28473884f4_b.jpg

50230422217_ae389fb887_b.jpg

50230203241_ec5085901d_b.jpg

50229566223_9dc9958e85_b.jpg

50230203076_229f5bbc7a_b.jpg

50229566933_03e214e14d_b.jpg

50230211846_f774538c72_b.jpg

50230431297_f9990a7dfa_b.jpg

50230431517_145050db9e_b.jpg

50229567828_8c030799af_b.jpg

50230432317_fe261d14a6_b.jpg


End of final coat of asphalt to the east waiting stripping.
50229568413_2e8b3198e5_b.jpg

50230213496_204a3c0ff3_b.jpg

50230433062_010d8a79d4_b.jpg

50230433337_a80076c01e_b.jpg
 
Cycles can now use the new path from/to Six Point Plaza on Dundas to/from Bloor St intersection. All the missing sections have been pave as well the whole area has been marked for cycles. The section on Bloor west of Kipling is also pave for use.

No idea where the contractor has disappear to, but very little in sidewalk work has taken place since I last saw it. They pour the south-west corner of Bloor and Dundas and nothing for the other 3 corners.

They have built 90% of sidewalk on the north side for Six Point Plaza except the entrances and where hydro pole still need to be remove. The block up to Aukland still not done considering the curb layout been ready for the last month.

The hoarding for Westward has been remove to allow the curb and sidewalk to be built in front of it. All new traffic lights install and waiting for hock up and other road to be done before putting into operation.
 
1598894257529.png


Really like how the parcel of land on the south side of Six Points Plaza (lower left of picture) was retained by city to make open and wide sidewalks for public use instead of being sold off. Nice!

Edit:

Just realized that the design is in keeping with the original path of Dundas street (as indicated in the above post) and will be incorporated into the other parcels of land adjacent to this parcel. I had to look twice to finally catch on lol.

How cool that the city is trying to honour architectural history with this design.
 
Last edited:

Back
Top