The excavator has been removed from the site. And at least for a week nothing much has happened there.

I wonder what it means?
 
Recent pics
June 2, 2011

EssCx.jpg



u5XON.jpg



7cb7K.jpg



i2QMG.jpg



XhsIw.jpg



sCFD1.jpg



O6Ort.jpg
 
An excavator is back on the site. Perhaps the other one broke down and had to be replaced.
 
Good to see a lot of activity on the site this morning, with a line of dump trucks waiting to be filled up.
 
Pics taken June 25, 2011


IfRkp.jpg



amveI.jpg
 
They are working very diligente and caution to avoid earth collapse bacause TTC tracks running at the edge of excavation ground

They're not even excavating over the tunnel. Image the slow grinding pace that 501 Yonge will proceed at...the tunnel runs at an angle underneath it!
 
501 is over a concrete encased tunnel. Here you drop one 2x4 on the track and the trains come to a halt. Big difference.
 