I live in the Liberties Condo right beside the Aura construction site. We just received notice that construction will be starting on January 4, 2010.
Well, it's activity at any rate. I'd imagine it'll be awhile before major construction starts, there's still hoarding to be built and piles to be driven.
Is the parking ramp off of Gerrard also closed tho? I was under the impression that the ramp was going to be either removed or replaced during the construction of Aura. If I'm not mistaken the loading docks can also be reached from the Bay St. parking garage entrance at RoCP, but I'm not sure about overhead clearance for bringing in large trailers.
The big outdoor ramp you see on Gerrard is the loading ramp. It will be relocated temporarily (still accessing Gerrard) while the permanent ramp (located roughly where the current ramp is) is built within the Aura project. The new loading ramp will cut through the parking garage but will be separate from the parking. Aura’s parking will be accessed from a new ramp located west of the loading ramp.
I found this nice shot on Flickr... Even though Aura isnt there yet... I bet it will look SWEET from this angle!... (you'll just have to picture what it'll look like for now!)
....with what appears to be some dark green fabric (?), has been put up around the perimeter of the site.