Top of my list as soon as I get flyable weather on an upcoming weekend.
 
A box culvert for storm water, being installed to replace the old system. The Brightwater site will tie into this system which lies of to the side of the very south end of Mississauga Road.
DSC_7932.jpg

DSC_7934.jpg

Where the culvert meets the Lake, temporarily closed off.
DSC_7940.jpg
 
August 27
DJI_0859.JPG
DJI_0866.JPG
DJI_0867.JPG

More photos in the other Brightwater thread showing the roads and preliminary digging for the townhomes on the west side.
 
Over the last seven days:
DJI_0155e.jpg
DJI_0149ce.jpg


It appears a new crane base is being prepared.
DJI_0180.JPG
DJI_0188.JPG
DJI_0271e.jpg
 
Thanks for the great picture update! Looks like it’s progressing well. Do you think the chance of Phase 1 being done by May 2023 being very possible at this point?
 
December 17th
So what had been four cranes on premises (including one for the Mason) I see has been reduced to three after the blue and red one closest to Lakeshore was removed since my last visit November 6th. Additionally, the roads have been paved, including the western side townhouses.
DJI_0522.JPG
DJI_0526.JPG
DJI_0530.JPG
DJI_0532.JPG


That's a lot of conduit. I wonder if they ever miss one or two after the floor is poured.