drum118
Superstar
The problem for a Kingsbridge stop is the final design of the LRT crossing 403 that is subject to the approval of MTO. The last I heard, that bridge design was before MTO for approval. This includes how the LRT will get back to the centre of the road since the LRT bridge is on the west side of the current bridge and ramp. The ramp to 403 southbound can be move south, but require drivers to reduce speed to it
Once MT removes 7 & 34 and after the LRT is built, current plans calls for a 19 to run every 15 minutes servicing existing stops around 2022/23. LRT service is supposed to be every 10 minutes, but not set in stone at this time.
The quality of service for the LRT is being funded by the city who have no idea at this time what that cost will be until the contract is awarded this fall. With the elimination of 103 and cut in service of 19, those saving will toward the operation cost of the LRT. The city has a plan in place to deal with the LRT operating cost, subject to the signing of the contract that can change things.
Once MT removes 7 & 34 and after the LRT is built, current plans calls for a 19 to run every 15 minutes servicing existing stops around 2022/23. LRT service is supposed to be every 10 minutes, but not set in stone at this time.
The quality of service for the LRT is being funded by the city who have no idea at this time what that cost will be until the contract is awarded this fall. With the elimination of 103 and cut in service of 19, those saving will toward the operation cost of the LRT. The city has a plan in place to deal with the LRT operating cost, subject to the signing of the contract that can change things.