cplchanb
Senior Member
wow they certainly have a VERY long way to go... probably into 2028/9 at this rate.
The video reinforced what I have been saying for years along with the photos I have shot as well a few videos that been posted here or up on my sites..wow they certainly have a VERY long way to go... probably into 2028/9 at this rate.
As evidenced by the LRTs in Toronto, it takes at least 2 years (maybe even 4) after all tracks are in place for the project to actually open to the public. Considering Hurontario's tracks are not even fully laid, and don't look to be be fully done until EOY 2026 or sometime in 2027, we actually might be looking at 2028-2029... We are talking about a proportionally worse delayed project than Line 5 Eglinton.wow they certainly have a VERY long way to go... probably into 2028/9 at this rate.
Great video but clearly this project is a MESS! The amount of track being torn up and relaid seems excessive - another Eglinton!My latest update of the projects progress, filmed on Thursday: "Hazel McCallion LRT November 2025 | Progress Update"
Exactly what I said.Great video but clearly this project is a MESS! The amount of track being torn up and relaid seems excessive - another Eglinton!
On Friday and Monday they were paving the east sidewalk for this area as well pouring the curbs for the southbound both ramps for the 407.It's time.
View attachment 696775
View attachment 696776
On top of this notice, it looks like the work on Topflight is going to continue until Mid-December with a partial intersection reopening. Vehicles will be able to go Eastbound onto Topflight from Hurontario northbound, but will not be able to go Southbound on Hurontario from Topflight, or make a left turn from Hurontario to go eastbound onto Topflight.. The updated notice states that the work will be 24/7, so it seems that this intersection is a priority for them.
One can say why wasn't the 3rd track bridge for Hurontario built back around 2010(?) when the Cawthra Rd 4th track bidge was bult on the north side of the existing 3 track bridge?So, nobody thought about building the base for a widened CPKC bridge before the LRT starts running ?
It's going to be that much more difficult to erect a new central pier with the trams going by.
- Paul
They were hard at work this morningIt's time.
View attachment 696775
View attachment 696776
On top of this notice, it looks like the work on Topflight is going to continue until Mid-December with a partial intersection reopening. Vehicles will be able to go Eastbound onto Topflight from Hurontario northbound, but will not be able to go Southbound on Hurontario from Topflight, or make a left turn from Hurontario to go eastbound onto Topflight.. The updated notice states that the work will be 24/7, so it seems that this intersection is a priority for them.
Better check the southbound curb lane based on what I saw todayThey were hard at work this morning
View attachment 697180
View attachment 697181View attachment 697182
And this evening
View attachment 697183View attachment 697184View attachment 697185
View attachment 697187
Great shots as usual Drum!Nov 17
More up om my site
Centre pier for the 403 bridge having protection poured for it.
![]()
Guideway Ramp to Hurontio St still being worked on
![]()
Eglinton Station shelter being installed by Orion
![]()
Matheson Station Shelter partly installed with form work taking place for the planter retraining wall being formed.
![]()
Don't recall seeing a concrete base on Friday but looks like it been poured with trackwork taking place. This interception was fully remobed.
![]()
Courtneypark Station being partly installed by Orion in place of fabercation crew from Quebec
![]()
Skyway intersection could be open by the end of next week ahead of scheduel. Most of the northbound track was poured with a small section to be poured the next day. On Nov 20 concrete was being poured for the southbound track. Once all concrete is pour a top coat of concrete will be pour between the tracks as that area has been mill. Don't recall if Courtneypark intersection saw the centre area mill or poured concrete.
![]()
Thanks for taking a look. Depending on how the weather fares for me, I'll take a trip out to see what it looks like above.They were hard at work this morning
View attachment 697180
View attachment 697181View attachment 697182
And this evening
View attachment 697183View attachment 697184View attachment 697185
View attachment 697187