drum118
Superstar
Signed. God I hope this does something.
Even if it turns into a SOS 2, that could be enough for either Miller to get booted out and Transit City to be reworked, or for higher-ups in the government to start demanding subway instead of LRT.
Dream on.
There are better places for a subway now than here.
Considering how much the government has or willing to spend, mostly new lines BRT will be built with a few LRT. Getting a subway is based on who you know in the Government that has some powers to get it built.
The government choke on the first 90 billion plan presented to them and then cut it to 50 billion. Still leaves a 70 Billion short fall for what I have seen that need to be built over the next 20 years to get people out of their cars.
With all these request for GO service outside the RTP area, something has to give by taking longer to get built, down size or more money found to do it.
Will not be supporting petition and construction will not effect Miller or TC plans in 2010 as construction will only be starting on the line, not the 2009 timetable.