This work is more specifically for the moving and testing of the new stopping positions at Eglinton Station.Phase 1 through 5 deployed ATC using pre-existing switch and stop locations. There is a phase 6 which optimizes these things a bit, including shifting the Eglinton station stop locations a little north.
I assume that this is the start of Phase 6.
There is other work ongoing in the optimization of the system that has caused the early mid-week closures, and will continue to do so throughout the rest of this year.