Not going to happen as it's too costly and taking over a decade or 2 to do.View attachment 528919View attachment 528920
It all comes back to the freight bypasses. The only way to improve service on the Milton line is to get CP to divert their main line to go north around Brampton, and then towards their Intermodal yard in Vaughan. The 413 bypass.
You are putting all your eggs in one basket to have s system melt down if a major issue happens on that joint corridor. More so, who is paying for it as it has nothing to do with CP and CN in the first place??? To do it will have to be covered by the province 100%, with Markham totally opposed to the plan in the first place.
You can put 4-5 tracks in that corridor today with no issues at all doing so, other than adding a 5th bridge to the 4 track bridges already in place.
Only will cost between $2.3 to $3 billion to do it as well when. If it got built like the 2018 election platform, it would be in service today.