Now that Niagara is a 7-day, all year service, I would suggest adding CTC for the short stretch from Clifton (MP2.6) to the platform at the Falls (MP 0.6) with a power switch and signalling on the siding at the Falls. CSXT signalling begins at MP 0.0, and it would not be unreasonable to signal all the way to that point. Replace the crossovers at Clifton to allow 45 mph through those.
That, and some track sprucing-up, would allow speed to be raised above the current 20 mph PSO with Rule 105 limitations. It's a short stretch, but would add flexibility at Niagara Falls especially to clear the Maple Leaf. No complicated new trackage required, pretty cheap to install.
For that matter, I wonder how VIA would feel about a J-trained Maple Leaf combined with a 6-car GO train, adding just a bit of extra capacity and making only the VIA stops.
- Paul
That, and some track sprucing-up, would allow speed to be raised above the current 20 mph PSO with Rule 105 limitations. It's a short stretch, but would add flexibility at Niagara Falls especially to clear the Maple Leaf. No complicated new trackage required, pretty cheap to install.
For that matter, I wonder how VIA would feel about a J-trained Maple Leaf combined with a 6-car GO train, adding just a bit of extra capacity and making only the VIA stops.