Had to cut my trip short and try to shoot the area on Sat, but where I normally park, no way to it. The Queensway, Lake Shore and the Gardiner were a parking lot to the west of the Humber at 4pm along with pack side streets. To make a left turn off the Queensway to go west on the Lake Shore were backup for at least 3-5 or more light depending om the intersection. Did a U-turn on Windermere to get to the LS.
3 northbound Roncesvalles platforms still been worked on and are basely completed. All southbound are completed.
Had a look on Sunday and if service to start Sept 3rd here what to happen.
City:
Both roads still need to be completed with landscaping west of Glendale
Traffic lights to be install at Glendale
Traffic lights turn on at Sunnyside Dr
Clean up
TTC
3 more poles to be install
22 single and double track brackets to be install on the poles
Power line to be install on the poles
OS to be stung
Platform Shelters to be install
Cleaning of the tracks
Testing and this is not for few trips. The curve for the old dip area is now an elevated and many speed test will have to be done to make sure there isn't a car laying on its side taking the curve, especially going eastbound
I have yet to do anything on these photos as they are close to 2000 now from what I have to work on first and only a few of them
Eastbound higher than the westbound