And so it should. RBC had a head start. Back when I took some pictures on April 22/07 RBC was basically at ground level whereas BA was still digging the foundation.
Besides I think Ellis-Don is the general contractor for both projects. I think BA has an occupancy date for the lower floors for Feb. 09 so I'm not sure this "race" is over yet.
Does anyone know when they will start on the large banking box? I was under the impression that it was going to be built simultaneously with the rest of the building, but from the looks of it, they are using the space for storage and cranes etc. - any info on this?
^^Yeah that does look like the initial elements of the box, however, I was just curious to know why it hasn't been progressing along with the rest of the building? by the way thanks..
The most recent renderings seem to suggest that the thin opaque glass banding on each floor will continue up the tower, which will break up the mass of curtain wall nicely... should create a very handsome tower.