Urban Sky
Senior Member
I mean these days you might as well put down Class 6 rail and squeeze out 110mph/177kmh since you can. Still not high speed but I dont see the point of rebuilding to class 5 when you can do class 6. The Venture sets can do 125mph, might as well put down Class 6 with at grade crossings.
Exactly! It depends on what the incremental infrastructure and track maintenance requirements between Class 5 and the still-yet-to-defined Track Class 6 will be.It depends on the cost differential. I gather the ventures have been approved for the “LRC” maximum speed of up to 100 mph on class 5 track, so you’re likely only looking at a 10% increase in maximum speed, and even then only if the geometry allows it.
In general (and admittedly simplified terms), Track Class drives the Zone Speed, geometry drives Permanent Slow Orders (PSOs) and track maintenance levels drive Temporary Slow Order (TSOs). When you look at the long straight segments in Western Canada (or just the CN-owned Eastern half of the Chatham Sub!), it‘s certainly not geometry which limits speeds to 80 or 60 mph (i.e., the maximum speeds of Track Classes 4 and 3, respectively) or even less…
Last edited: